Installation
Laying patterns
|

Scaletta
|

Bridge Deck
|

Bridge Deck Diagonal
|
|
|

Ship Deck
|

Ship Deck Diagonal
|
|
|
Where
•It can be laid on concrete screeds from 5 up to 7 cm thick. Concrete screeds are suitable both traditional or quick-drying hydraulic-binder based. They must be compact, solid and flat.
•It can be laid on pre-existing floors which must be compact and properly degreased.
•It can be laid to replace carpets, after taking them off, removing all residual glue and making sure the underfloor is compact enough.
•It can be laid on an existing parquet flooring after sanding only if it is well fixed on the underfloor. The new parquet flooring must be set perpendicularly to the old one.
How
•The traditional wood floor is made up of solid wood elements that have to be stabilized with a long and articulated laying cycle. After laying it is necessary to wait 20 days to allow a correct adjustment of wood before sanding and finishing.
•The wood floor must be always laid glued considering that the glues mus be correctly spread on the underfloor and not on the sides or heads of the strips.
•Further information on laying must refer to the "Manuale per la posa di pavimenti di legno per uso civile" ("Manual for laying wooden flooring in homes")(Edilegno - Federlegno Arredo).
When
•The traditional wood floor mus be laid before painting, installing the doors' counterframe. Sanding and finish must be the very last operation before furnishing.
Further information
Please make refernce to the product sheet included in every single pack of parquet.